Second generation, serving the Greater Seattle area from Lake Stevens Licensed & bonded  · (206) 510-1037
A large open plan home mid project with hardwood partly laid across the main level
Home  /  About

Second Generation, and Still on Every Job

My dad ran this business for over thirty years. I bought it from him, and I am still the one on your floor.

Thirty years of my father, then eight of my own. Licensed and bonded, employees on the books, everything in writing.

In short

My father started Unique Hardwood Floors in the 1980s and ran it for better than thirty years. I grew up working for him, full time and without summers off, and I learned every machine and every part of the job before I was grown. When he tore his rotator cuff I came back to run it, and a year and a half later I bought the business outright so he could retire. That was eight years ago. I am licensed and bonded, my employees are on the books, and the person who quotes your floor is the person standing on it.

The story

How this business got here

Two generations, one standard, and a rotator cuff that changed the plan. The short version is that I did not inherit this. I bought it.

My dad started this in the 1980s, right before I was born. He had been working for other companies and went out on his own, back when it was all manual nailers and there was nothing easy about any of it. He ran it for better than thirty years.

The thing about him was perfection. That was the whole standard, and he ground it into the business and into me. He was not soft about it.

I grew up working for him. Not a summer job, either. His rule was that once you are an adult you do not get summers off, you work full time and you see your friends on the weekend. So by the time I was grown, I knew how to run every machine and every part of the job. He never gave me a raise, and I bring that up with him regularly.

Bare hands running a card scraper along the edge of a white oak floor board
A worn hand plane and mallet resting on oak boards in a workshop window

I was at Lake Washington Tech studying diesel and heavy equipment, which was going to be my thing, when he called. He had torn his rotator cuff badly enough that it was not coming back the way he needed it to. I came back to run it for him.

A year and a half later he still could not do the work the way he used to, and I made him an offer. I would buy the business outright so he could retire, and I would get to run my own thing instead of working for my father. I probably paid more than it was worth. I made him monthly payments until it was paid off.

I am not going to dress it up. I am a small business, I bought my first house a few years ago, and I have two kids. That is exactly why I do not gamble with somebody else's floor. A bad job follows a small shop around, and I do not have a brand name to hide behind.

How I work

Three things that do not change

They are the same on a hallway and on a six thousand square foot custom build, and they are the reason the paperwork is heavier than most flooring guys hand you.

No middlemen

You deal with me

No estimator, no scheduler, no subcontracted crew. I quote it, I am on it, and I walk the finished floor with you at the end, in daylight.

Straight answers

Honest about your options

I will tell you to refinish instead of replace, or to put down LVP instead of hardwood, even when the other answer pays me more. That happens regularly.

On paper

Everything in writing

A four to five page contract before we start, with your dates in it, and every stain color signed off by you before it goes anywhere near your floor.

Builders

Working with builders

Custom home builders are some of my best customers, and a few of them have not used anybody else in years. On a custom build I am often back three or four times before the house is done.

Interior of a custom home under construction with wide plank white oak staged on the subfloor

I do both the installation and the refinishing on their projects, which means one sub instead of two and one person accountable for how the floor turns out.

They keep calling because they know what my pricing is, I hold the schedule I gave them, and I carry the paperwork a licensed GC actually needs from a sub. L&I, insurance, signed contracts, and a written change order any time the scope moves instead of a conversation nobody wrote down.

Most of the builders I came up with are retiring now, so I have been deliberately building relationships with the younger ones taking over. If you are running custom residential and you need a flooring sub who answers his own phone, call me.

Crew and equipment

Why a bigger crew would not be faster

A typical job runs about a week. We are a small outfit by design. People ask whether a bigger company would get it done quicker, so here is the real answer.

01The house sets the limitA house has only so much power in it. You cannot run more sanding machines than the wiring will carry, so past two machines you are adding people, not speed.
02More bodies get in the wayI have had five guys on a job and spent the day splitting them up to keep them out of each other's way. That is not a schedule improving, that is payroll going up while the floor takes just as long.
03Equipment is what changes itWhat moves the result is the machine, not the headcount. The money goes into sanders rather than another layer of management, and the refinishing page explains what that does to a floor.
Licensed & bonded

L&I, employees on the books, nothing under the table.

5.0 on Google

Across every review the business has.

Estimate in 2 to 3 days

In your home, and free.

One person, start to finish

You deal with me on the quote and on the job.

In their words

What people say about working with Greg

Three of the eighteen reviews on the Google listing. The pattern in them is the reason the site is written the way it is.

“I got three quotes, but I felt the most confident with him. He guided us through the process, provided us with stain samples, and kept us informed on everything, as we hadn't moved into the house yet.”

Jaadi Marchant2 years ago on Google

“Greg was helpful, personable and worked with my schedule to the best of his ability. He truly went above and beyond to make sure I got exactly what I wanted and was honest, fair and timely with his quote.”

Maresa Edwards4 years ago on Google

“Greg and his team were amazing. Our floors are gorgeous. We had him out a few years ago to update our floors and he did such a great job we had him come again when we remodeled this year.”

Sandra Rubow5 years ago on Google

Read all 18 reviews on Google
A refinished floor in an empty dining room, Mill Creek
Talk to the person doing the work

Second generation, eight years on my own, and still the guy who shows up.

Tell me about the room. The estimate is free, it is in your home, and it is usually two or three days out.

Call Free estimate